Step 2 - Packing the Case
• Include Rx in case box, do not tape case box closed
• Put as many cases that fit in each box (separated)
• Put up to 4 boxes in a shipping bag
• Attach pre-printed shipping label
Step 3 - Contact Maestro
• Include Rx in case box, do not tape case box closed
• Put as many cases that fit in each box (separated)
• Put up to 4 boxes in a shipping bag
• Attach pre-printed shipping label
Local Due Dates
Item | # of Days |
PFM & PFG | 7 days |
Full Metal Crown | 7 days |
eMax/IPS Empress, Veneer | 15 days |
BruxZir Crown | 15 days |
PFZ | 10 days |
LAVA | 10 days |
PROCERA | 10 days |
Temporary Restorations | 7 days |
Implants | Per case |
Muitl Units (6+) | Add 3 Working Days |
Mailer Due Dates
Item | # of Days |
PFM & PFG | 3 weeks |
Full Metal Crown | 3 weeks |
eMax/IPS Empress, Veneer | 3 weeks |
BruxZir Crown | 3 weeks |
PFZ | 3 weeks |
LAVA | 3 weeks |
Procera | 3 weeks |
Temporary Restorations | 3 weeks |
Implants | Per case |
Mutl Units (8+) | Add 3 working days |